Construction Process: Swimming Pools

The process starts with laying out the pool and digging the hole.  Hubert with Cox Pools is operating the excavator.
The walls are formed with wire mesh and steel rods.
The walls are sprayed with a high pressure mixture of concrete called shotcrete.
Mick with Cox Pools on the nozzle.
Jimmy applying tile trim to the water line and spa spillway.
Cooldeck texture is being applied to the pool deck.  Later it will be painted.
Plaster is being a sprayed on the rough pool shell then troweled smooth.
A swim out ledge is being plastered.
Pavers can be used for the pool deck.
 - Thumb Pic 1
 - Thumb Pic 2
 - Thumb Pic 3
 - Thumb Pic 4
 - Thumb Pic 5
 - Thumb Pic 6
 - Thumb Pic 7
 - Thumb Pic 8
 - Thumb Pic 9

Swimming Pools

Les White, Acorn Construction General Contractor, #RG0055853
Copyright © 2024 Acorn Construction